Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

EMERGENCY LIGHTING

DaisaTest - centralized emergency lighting monitoring system (TEV units)

DaisaTest is a centralized monitoring system that checks every emergency luminaire of an installation from one computer and schedules maintenance to the requirements of EN 50172. TCA series luminaires are connected by a bus to TEV-1000, TEV-500 or TEV-200 units, and these to the computer via RS232 or Ethernet.

Controllers
TEV-1000, TEV-500, TEV-200
Communication
bus to TCA luminaires; RS232 or Ethernet to PC
Tests
functional every 3-30 days, autonomy every 3-12 months
Notifications
e-mail, reports

Technical specifications

ControllersTEV-1000, TEV-500, TEV-200
Communicationbus to TCA luminaires; RS232 or Ethernet to PC
Testsfunctional every 3-30 days, autonomy every 3-12 months
Notificationse-mail, reports

Specifications are taken from the manufacturer’s technical documentation. Updated .

Description

The system includes TCA luminaires with a self-test function and a bus interface, TEV control units and a control computer. The units work as communication nodes between the luminaires and the computer. The system continuously monitors the presence of mains power, communication with the luminaires, battery charge and short circuits. The functional test is performed by default every 30 days, and the interval is set from 3 to 30 days. The autonomy duration test runs every 3 months and is set from 3 to 12 months. Results are shown on the screen, and the system sends configurable notifications and reports by e-mail. CB central batteries also use DaisaTest for maintenance per EN 50172. The system is installed in hospitals, airports, shopping and office centres, hotels and universities, where manual checking of each luminaire is labour-intensive and documentation of tests is needed. The manufacturer has been designing emergency lighting since 1980.

How to choose

The connection to the computer is chosen for the existing infrastructure, RS232 or Ethernet. TEV units are made in three versions, TEV-200, TEV-500 and TEV-1000, but the capacity of each in terms of the number of luminaires is not stated on the system page, so it is clarified from the technical documentation. The luminaires in the installation must be of the TCA series, otherwise they cannot be connected to the bus.

Request a price and lead time

DaisaTest - centralized emergency lighting monitoring system (TEV units). We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

How often does DaisaTest perform the functional test of the luminaires?

By default every 30 days, and the interval is set from 3 to 30 days.

How often is the autonomy duration checked?

Every 3 months by default, and the interval is set from 3 to 12 months.

What control units are included in the system?

TEV-1000, TEV-500 and TEV-200. They serve as nodes between the TCA luminaires and the computer.

How is the system connected to the computer?

TEV units are connected to the computer via RS232 or Ethernet, and a bus cable runs to the luminaires.

What does the system monitor and how does it notify about faults?

Mains power, communication with the luminaires, battery charge and short circuits, and it sends notifications and reports by e-mail.

Similar products

Emergency lighting

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.