NoDig SLM® 3.0 PE 100-RC gas pipe in a PEplus protective sheath for trenchless laying, OD 25–1600 mm
Country: · Model: NoDig SLM® 3.0
NoDig SLM® 3.0 gas pipe of PE 100-RC in a PEplus protective sheath for trenchless laying, outside diameter 25–1600 mm, SDR 11 and 17. The sheath protects the service pipe from scratches, gouges and cuts during pulling-in and operation. This is the third generation of the sheathed pipe technology that came to the market in 1991.
- Outside diameter
- 25 … 1600 mm
- SDR
- 11, 17 (others on request)
- Service pipe
- PE 100-RC, black
- Protective sheath
- modified polyethylene PEplus, orange-yellow (gas marking)
Technical specifications
| Outside diameter | 25 … 1600 mm |
|---|---|
| SDR | 11, 17 (others on request) |
| Service pipe | PE 100-RC, black |
| Protective sheath | modified polyethylene PEplus, orange-yellow (gas marking) |
| Standards | DIN 8074/8075, EN 1555, DVGW GW 335 |
| Testing | TÜV SÜD MUC-KSP-A 3003 |
| Joining | butt welding per DVS without removing the sheath |
| Supply | straight lengths 6, 12, 20 m; coils 100 m; drums |
| Hydrogen | H2ready |
Specifications are taken from the manufacturer’s technical documentation. Updated .
Description
The service pipe is black, made of PE 100-RC, and the sheath is orange-yellow and marks gas. The pipe complies with DIN 8074/8075, EN 1555 and DVGW GW 335, and tests were carried out by TÜV SÜD (MUC-KSP-A 3003). It is supplied in straight lengths of 6, 12 or 20 m, in 100 m coils and on drums. Butt welding with a heated tool per DVS rules is done without removing the sheath, so installation and later tie-ins are simpler. The system is recyclable. Laying methods include horizontal directional drilling, relining, pipe bursting of the old pipe with possible diameter increase, ground piercing, laying by plough and cutter, and open trench. During relining and bursting of the old pipe the sheath protects the service pipe from sharp fragments. The pipes carry the H2ready mark, the DBI institute confirmed tests with 100% hydrogen, and the material is resistant to natural gas and condensate per EN 1555.
How to choose
NoDig SLM 3.0 is taken when the route is not excavated and the diameter goes up to 1600 mm, that is above the 630 mm of the other lines. For a gas pipeline without a sheath laid in a trench, 9010 RC will do. If after laying you need an electrical integrity check and route location, look at SLM DCT, and for early damage detection egeSmart:Integrity DCS.
Request a price and lead time
NoDig SLM® 3.0 PE 100-RC gas pipe in a PEplus protective sheath for trenchless laying, OD 25–1600 mm. We reply within one business day.
Or email office@usk.ua or call +38 (044) 339-50-20.
FAQ
What is the PEplus protective sheath for?
It protects the service pipe from scratches, gouges and cuts during pulling into the ground and operation, so trenchless methods do not shorten the service life.
Does the sheath need to be removed before welding?
No, butt welding with a heated tool per DVS rules is done without removing the sheath first.
What diameter range does NoDig SLM 3.0 have?
From 25 to 1600 mm, SDR 11 and 17, others on request.
Which trenchless methods suit this pipe?
Horizontal directional drilling, relining, pipe bursting, ground piercing, laying by plough and cutter.
Is the pipe suitable for hydrogen?
Yes, it carries the H2ready mark, and the DBI institute confirmed tests with 100% hydrogen.
REQUEST
Need a price, lead time or replacement?
Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.


