Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

CHARGE CONTROLLERS AND EMS

Power Plant Manager — power plant energy management system

The Power Plant Manager (PPM-10) plant controller runs energy management and grid control on megawatt-class PV and hybrid power plants, handling up to 200 devices in the base configuration. The cabinet runs on the ennexOS platform and sits at the plant grid connection point.

Application
megawatt-class PV and hybrid power plants
Platform
ennexOS
Functions
monitoring and control of generation to grid requirements

Technical specifications

Applicationmegawatt-class PV and hybrid power plants
PlatformennexOS
Functionsmonitoring and control of generation to grid requirements
More from the manufacturer’s documentation
ModelPPM-10
ConfigurationsData Manager L (unlimited size, up to 200 devices); with Hybrid Controller M (up to 2 MW, 120 devices), L (120), XL (200)
Max. number of gensets16 (with Hybrid Controller)
Max. number of battery inverters32 (HyCon M, L), 200 (HyCon XL)
NetworkEthernet 10/100/1000 Mbit/s, optical fiber (optional)
Inputs / outputs2 DI, 4 DO (Data Manager L); 16 DIO (Hybrid Controller); RS485; 1 × USB 3.0, 2 × USB 2.0
Telecontrol protocols (optional)IEC 61850-7-4, IEC 60870-5-101/-104, DNP3, OPC UA
Genset controller communicationModbus/TCP via Ethernet 100BASE-FX and TX
Supply voltage100–240 V AC / 18–32 V DC / 30–60 V DC / 90–110 V DC
Operating temperature−25 °C to +45 °C
Relative humidity5–95% non-condensing
Installation altitude0–2,000 m
Degree of protectionIP54 / NEMA 3
Dimensions (W × H × D)800 × 1,000 × 300 mm
Weightapprox. 75 kg
Mounting / enclosurewall mounting / powder-coated sheet steel
Control functionsblack start, grid synchronization, P and Q control, frequency control, microgrid and genset management, power-to-gas
External setpoint log18 months
CertificatesVDE-AR-N 4110/4120/4130, TED 749 (NTS)
Compatible power analyzersPower Analyzer, Energy Meter, Janitza UMG 604/605, Schneider ION 7400/9000, Elkor WattsOn Mark II
Compatible invertersSunny Tripower X, Sunny Tripower Storage X, Sunny Island X, Sunny Highpower PEAK3, Sunny Central UP, Sunny Central Storage
Compatible genset controllersComAp InteliGen/Sys NTC, CRE GENSYS 2.0, DEIF AGC, DSE8610, DSE8810, Woodward easYgen 3000
Customs codes (for reference)
HS code9032.89
UKTZED code (Ukraine)9032890000
CN code (EU)90328900

Specifications are taken from the manufacturer’s technical documentation. Updated . Customs codes are for reference only; the final code is determined at customs declaration for the specific model.

Description

The unit collects monitoring data from the whole plant and, following grid operator requirements, sends active and reactive power setpoints to the inverters and storage, controls frequency, synchronizes with the grid and performs black start. In hybrid plants the controller splits duty between solar generation, the battery and gensets, talking to genset controllers over Modbus/TCP via Ethernet 100BASE-FX and TX. External setpoints are logged for 18 months, and configuration and logs are available through ennexOS. For the dispatch link, IEC 61850-7-4, IEC 60870-5-101/-104, DNP3 or OPC UA are optional, and the 10/100/1000 Mbit/s Ethernet network can be extended with fiber. The powder-coated sheet steel cabinet measures 800 × 1,000 × 300 mm, weighs about 75 kg and mounts on a wall. IP54 / NEMA 3 and the −25 °C to +45 °C range permit installation in an unheated substation. The supply is matched to the site, 100–240 V AC or 18–32, 30–60 or 90–110 V DC from the substation auxiliary supply.

How to choose

Pick the configuration by plant makeup. A pure PV plant needs only the Data Manager L version with no size limit. With storage or gensets, add a Hybrid Controller, where M covers plants up to 2 MW and 120 devices, L covers 120 devices and 32 battery inverters, and XL covers 200 devices and 200 battery inverters, each taking up to 16 gensets. If the plant needs no telecontrol or VDE-AR-N 4110/4120/4130 certification, a standalone Data Manager M for 50 devices will do.

Request a price and lead time

Power Plant Manager — power plant energy management system. We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

What platform does the Power Plant Manager run on?

On ennexOS, which also gives access to configuration and logs.

What plants is the Power Plant Manager meant for?

For megawatt-class PV and hybrid plants, including those with storage and gensets.

What does the Power Plant Manager do at a PV plant?

It monitors the plant and controls generation to grid requirements by sending P and Q setpoints to the inverters.

Which telecontrol protocols does the Power Plant Manager support?

IEC 61850-7-4, IEC 60870-5-101/-104, DNP3 and OPC UA as options.

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.