
Power Plant Manager — power plant energy management system
Country: Germany · Model: Power Plant Manager
The Power Plant Manager (PPM-10) plant controller runs energy management and grid control on megawatt-class PV and hybrid power plants, handling up to 200 devices in the base configuration. The cabinet runs on the ennexOS platform and sits at the plant grid connection point.
- Application
- megawatt-class PV and hybrid power plants
- Platform
- ennexOS
- Functions
- monitoring and control of generation to grid requirements
Technical specifications
| Application | megawatt-class PV and hybrid power plants |
|---|---|
| Platform | ennexOS |
| Functions | monitoring and control of generation to grid requirements |
| More from the manufacturer’s documentation | |
| Model | PPM-10 |
| Configurations | Data Manager L (unlimited size, up to 200 devices); with Hybrid Controller M (up to 2 MW, 120 devices), L (120), XL (200) |
| Max. number of gensets | 16 (with Hybrid Controller) |
| Max. number of battery inverters | 32 (HyCon M, L), 200 (HyCon XL) |
| Network | Ethernet 10/100/1000 Mbit/s, optical fiber (optional) |
| Inputs / outputs | 2 DI, 4 DO (Data Manager L); 16 DIO (Hybrid Controller); RS485; 1 × USB 3.0, 2 × USB 2.0 |
| Telecontrol protocols (optional) | IEC 61850-7-4, IEC 60870-5-101/-104, DNP3, OPC UA |
| Genset controller communication | Modbus/TCP via Ethernet 100BASE-FX and TX |
| Supply voltage | 100–240 V AC / 18–32 V DC / 30–60 V DC / 90–110 V DC |
| Operating temperature | −25 °C to +45 °C |
| Relative humidity | 5–95% non-condensing |
| Installation altitude | 0–2,000 m |
| Degree of protection | IP54 / NEMA 3 |
| Dimensions (W × H × D) | 800 × 1,000 × 300 mm |
| Weight | approx. 75 kg |
| Mounting / enclosure | wall mounting / powder-coated sheet steel |
| Control functions | black start, grid synchronization, P and Q control, frequency control, microgrid and genset management, power-to-gas |
| External setpoint log | 18 months |
| Certificates | VDE-AR-N 4110/4120/4130, TED 749 (NTS) |
| Compatible power analyzers | Power Analyzer, Energy Meter, Janitza UMG 604/605, Schneider ION 7400/9000, Elkor WattsOn Mark II |
| Compatible inverters | Sunny Tripower X, Sunny Tripower Storage X, Sunny Island X, Sunny Highpower PEAK3, Sunny Central UP, Sunny Central Storage |
| Compatible genset controllers | ComAp InteliGen/Sys NTC, CRE GENSYS 2.0, DEIF AGC, DSE8610, DSE8810, Woodward easYgen 3000 |
| Customs codes (for reference) | |
| HS code | 9032.89 |
| UKTZED code (Ukraine) | 9032890000 |
| CN code (EU) | 90328900 |
Specifications are taken from the manufacturer’s technical documentation. Updated . Customs codes are for reference only; the final code is determined at customs declaration for the specific model.
Description
The unit collects monitoring data from the whole plant and, following grid operator requirements, sends active and reactive power setpoints to the inverters and storage, controls frequency, synchronizes with the grid and performs black start. In hybrid plants the controller splits duty between solar generation, the battery and gensets, talking to genset controllers over Modbus/TCP via Ethernet 100BASE-FX and TX. External setpoints are logged for 18 months, and configuration and logs are available through ennexOS. For the dispatch link, IEC 61850-7-4, IEC 60870-5-101/-104, DNP3 or OPC UA are optional, and the 10/100/1000 Mbit/s Ethernet network can be extended with fiber. The powder-coated sheet steel cabinet measures 800 × 1,000 × 300 mm, weighs about 75 kg and mounts on a wall. IP54 / NEMA 3 and the −25 °C to +45 °C range permit installation in an unheated substation. The supply is matched to the site, 100–240 V AC or 18–32, 30–60 or 90–110 V DC from the substation auxiliary supply.
How to choose
Pick the configuration by plant makeup. A pure PV plant needs only the Data Manager L version with no size limit. With storage or gensets, add a Hybrid Controller, where M covers plants up to 2 MW and 120 devices, L covers 120 devices and 32 battery inverters, and XL covers 200 devices and 200 battery inverters, each taking up to 16 gensets. If the plant needs no telecontrol or VDE-AR-N 4110/4120/4130 certification, a standalone Data Manager M for 50 devices will do.
Request a price and lead time
Power Plant Manager — power plant energy management system. We reply within one business day.
Or email office@usk.ua or call +38 (044) 339-50-20.
FAQ
What platform does the Power Plant Manager run on?
On ennexOS, which also gives access to configuration and logs.
What plants is the Power Plant Manager meant for?
For megawatt-class PV and hybrid plants, including those with storage and gensets.
What does the Power Plant Manager do at a PV plant?
It monitors the plant and controls generation to grid requirements by sending P and Q setpoints to the inverters.
Which telecontrol protocols does the Power Plant Manager support?
IEC 61850-7-4, IEC 60870-5-101/-104, DNP3 and OPC UA as options.
Similar products
REQUEST
Need a price, lead time or replacement?
Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.



