Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

CHARGE CONTROLLERS AND EMS

SLC ENERGY MANAGER — smart meter for solar plant energy management

The SLC ENERGY MANAGER measures energy flows at the input of a solar installation and sends the data to EQUINOX2 inverters to control power flows and self-consumption. The meter is made in single-phase and three-phase versions, and the three-phase versions T and H are designed for 3×480 V.

Version
single-phase and three-phase (T, H 3×480 V), with current transformers
Setup
by cable or via WiFi, automatic configuration of current transformers
Communication
Modbus TCP

Technical specifications

Versionsingle-phase and three-phase (T, H 3×480 V), with current transformers
Setupby cable or via WiFi, automatic configuration of current transformers
CommunicationModbus TCP

Specifications are taken from the manufacturer’s technical documentation. Updated .

Description

The current is measured through current transformers installed on the input cables. The device configures the current transformers by itself, so the installer does not need to set their parameters manually. Setup is done by cable or via WiFi. In the three-phase version measurement is made for each phase separately, which is needed for correct export limiting on an unbalanced input. The meter exchanges data with the inverter over Modbus TCP. By its readings the inverter limits the feed into the grid to zero or to a set limit, and a hybrid system determines when to charge the battery and when to give energy to consumers.

How to choose

The version is chosen by the input of the site: single-phase for a single-phase house, and T or H of 3×480 V for a three-phase enterprise. The current transformers must match the maximum input current. The meter is designed to work with EQUINOX2 inverters, and compatibility with other brands is checked separately.

Request a price and lead time

SLC ENERGY MANAGER — smart meter for solar plant energy management. We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

What is the SLC ENERGY MANAGER needed for in a solar plant?

It measures power flows at the input and sends them to EQUINOX2 inverters to control export to the grid and self-consumption.

What is the voltage of the three-phase SLC ENERGY MANAGER?

The three-phase versions T and H are designed for a 3×480 V network and work with current transformers.

How is the SLC ENERGY MANAGER meter set up?

By cable or via WiFi, and the current transformers are configured automatically.

Which protocol does the SLC ENERGY MANAGER use to communicate with the inverter?

The Modbus TCP protocol. Through it the inverter receives data on the input power.

Which inverters does the SLC ENERGY MANAGER work with?

The meter is made for solar installations with EQUINOX2 inverters, grid-tied and hybrid. Compatibility with other brands must be checked separately.

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.