BATTERY ENERGY STORAGE SYSTEMS (BESS)
Samsung Battery Box SBB 1.0 / 1.5 (supplied by the manufacturer) — BESS container, 3.84–5.26 MWh
Country: Germany · Model: SBB 1.0 / SBB 1.5
Samsung Battery Box comes in two versions, SBB 1.0 at 3.842 MWh / 1.921 MW and SBB 1.5 at 5.26 MWh / 2.63 MW, both in a two-hour 0.5 CP mode. The containers use Samsung SDI cells and go into grid-scale battery parks that builds as an integrator.
- SBB 1.0
- 3.842 MWh / 1.921 MW
- SBB 1.5
- 5.26 MWh / 2.63 MW (from Q2 2026)
- Mode
- 2 h / 0.5 CP
- Cell chemistry
- NCA
Technical specifications
| SBB 1.0 | 3.842 MWh / 1.921 MW |
|---|---|
| SBB 1.5 | 5.26 MWh / 2.63 MW (from Q2 2026) |
| Mode | 2 h / 0.5 CP |
| Cell chemistry | NCA |
| Cooling | liquid, per module |
| Customs codes (for reference) | |
| HS code | 8507.60 |
| UKTZED code (Ukraine) | 8507600000 |
| CN code (EU) | 85076000 |
Specifications are taken from the manufacturer’s technical documentation. Updated . Customs codes are for reference only; the final code is determined at customs declaration for the specific model.
Description
The container holds NCA cells, which have a higher energy density than LFP, so more megawatt-hours fit on the same pad. Safety is built as a cascade, from cell level through the module up to the whole container. Cooling is liquid and per module, with each module on its own heat removal loop. Version 1.5 adds fire suppression built directly into the modules and runs quieter, which makes siting near housing easier. Deliveries of SBB 1.5 are announced from Q2 2026. The 2 h / 0.5 CP mode means rated power equals half the capacity and a full discharge takes two hours.
How to choose
The choice between versions comes down to project timing and site density. If commissioning falls before Q2 2026, SBB 1.0 is the one actually available, while SBB 1.5 packs more energy per container and less noise. Projects that require LFP chemistry should look at TALLON or Sunwoda NoahX at 2.5 MW. Running the park against trader schedules is the job of the Energy Controller Pro L.
Request a price and lead time
Samsung Battery Box SBB 1.0 / 1.5 (supplied by the manufacturer) — BESS container, 3.84–5.26 MWh. We reply within one business day.
Or email office@usk.ua or call +38 (044) 339-50-20.
FAQ
What is the difference between Samsung SBB 1.0 and SBB 1.5?
SBB 1.0 stores 3.842 MWh and delivers 1.921 MW, SBB 1.5 stores 5.26 MWh and delivers 2.63 MW. Version 1.5 has fire suppression inside the modules and a lower noise level.
What cells does Samsung Battery Box use?
Samsung SDI cells with NCA chemistry. Cooling is liquid and handled separately for each module.
When will SBB 1.5 be available?
Deliveries of SBB 1.5 are announced from Q2 2026. Until then projects are planned with SBB 1.0.
How many hours does a Samsung Battery Box container take to discharge?
The mode is 2 h at 0.5 CP, so rated power is half the capacity. For SBB 1.0 that means 1.921 MW against 3.842 MWh.
Similar products
REQUEST
Need a price, lead time or replacement?
Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.