Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

BATTERY ENERGY STORAGE SYSTEMS (BESS)

BOS-B / BOS-B Pro-A3 — 215 kWh per cluster C&I rack batteries

BOS-B battery racks hold up to 215 kWh per cluster on 314 Ah LiFePO4 cells. They work in C&I storage systems with a 100–125 kW PCS, and the whole system scales to 2.5 MW.

Chemistry
LiFePO4, 314 Ah cells
Module
16 kWh
Cluster
5–16 modules, up to 215 kWh
Current
168–180 A

Technical specifications

ChemistryLiFePO4, 314 Ah cells
Module16 kWh
Cluster5–16 modules, up to 215 kWh
Current168–180 A
Cycle life≥ 6,000 cycles
Ingress protectionIP20
CertificationsCE, IEC 62619, IEC 62040, UN 38.3
Customs codes (for reference)
HS code8507.60
UKTZED code (Ukraine)8507600000
CN code (EU)85076000

Specifications are taken from the manufacturer’s technical documentation. Updated . Customs codes are for reference only; the final code is determined at customs declaration for the specific model.

Description

A cluster takes 5–16 modules of 16 kWh, so capacity is matched to the specific PCS and the discharge duration required. Cluster current is 168–180 A, and the DC cable cross-section and protection rating between rack and PCS follow from it. Cycle life is at least 6,000 charge and discharge cycles, enough for daily arbitrage or peak shaving year after year. The enclosure is IP20, so the racks go indoors or into a climate-controlled container. CE, IEC 62619, IEC 62040 and UN 38.3 certificates are requested during project approval and for transport. The Pro-A3 version runs in the same pairing with a 100–125 kW PCS.

How to choose

The module count follows from PCS power and the hours of discharge needed, and a 215 kWh cluster on a 100 kW PCS runs at full power for about two hours. Sites of several hundred kilowatts use several clusters, each with its own PCS, up to the 2.5 MW system limit. With no indoor room and a need for an outdoor cabinet with the PCS inside, take the MS-G215 at 100 kW and 215 kWh rated IP54. At 250 kW the liquid-cooled MC-L522 with 522.5 kWh is the closer match.

Request a price and lead time

BOS-B / BOS-B Pro-A3 — 215 kWh per cluster C&I rack batteries. We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

How many modules are in a BOS-B cluster?

From 5 to 16 modules of 16 kWh, up to 215 kWh.

Which PCS does the BOS-B Pro-A3 work with?

A 100–125 kW PCS, with the whole system scaling to 2.5 MW.

What certifications does the BOS-B hold?

CE, IEC 62619, IEC 62040 and UN 38.3.

Can BOS-B racks stand outdoors?

No, the IP20 enclosure is meant for a room or a closed, climate-controlled container.

What current does a BOS-B cluster deliver?

168–180 A, with a cycle life of at least 6,000 cycles.

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.