Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

TEST AND MEASUREMENT

TCIL1 / TCIL2 / TCIDL1 three-phase class 1 meter-analyzers (transformer-operated and direct connection)

TCIL1, TCIL2 and TCIDL1 are three-phase class 1 accuracy meters for technical metering in 3×230/400 V networks. TCIL1 and TCIL2 connect through x/5 A current transformers, and TCIDL1 connects directly for 10(80) A. They are used to allocate costs between workshops, lines and tenants.

Rated voltage
3×230/400 V AC
Connection
TCIL1, TCIL2 — via x/5 A CTs (TCIL2 also x/1 A), programmable ratio; TCIDL1 — direct 10(80) A
Circuit current (CT-operated)
1.5(6) A
Accuracy class
1 (EN 62053-21)

Technical specifications

Rated voltage3×230/400 V AC
ConnectionTCIL1, TCIL2 — via x/5 A CTs (TCIL2 also x/1 A), programmable ratio; TCIDL1 — direct 10(80) A
Circuit current (CT-operated)1.5(6) A
Accuracy class1 (EN 62053-21)
TCIL2bidirectional, up to 6 tariffs, RS485 Modbus or BACnet, optional Ethernet Modbus TCP, 4 modules (70 mm)
Pulse outputSO (DIN 43864), up to 24 V DC
Networkthree-phase 3- or 4-wire unbalanced
StandardsEN 62053-21/-22/-23, EN 61010

Specifications are taken from the manufacturer’s technical documentation. Updated .

Description

Unlike the TCIDL-MID series, these instruments have no MID certificate, so they are suitable for internal metering and energy monitoring, not for billing. TCIL1 works with x/5 A measuring transformers, the ratio is programmable, and the circuit current is 1.5(6) A. It has an LCD, an LED consumption indicator, a current monitoring indicator and an SO pulse output up to 24 V DC. TCIL2 is bidirectional, meters consumed and delivered energy through x/5 A or x/1 A transformers, measures phase voltages and currents, active, reactive and apparent power, and supports up to 6 tariffs. The RS485 port with MODBUS RTU or BACnet links up to 32 instruments in a line, or 128 through a converter; there is a version with Ethernet (Modbus TCP), and the housing is 4 DIN modules (70 mm). TCIDL1 is rated for a direct current of 10(80) A for unbalanced networks, has a starting current below 0.4 % of IB, an SO pulse output to DIN 43864 and a 4-module DIN housing.

How to choose

The choice depends on the connection method. If x/5 A transformers are already installed in the board, take TCIL1, and when bidirectional metering, tariffs and RS485 are needed, take TCIL2. For direct current up to 80 A, TCIDL1 is enough. For commercial metering with a MID certificate, order TCIDL1-MID and the other TCIDL-MID models.

Request a price and lead time

TCIL1 / TCIL2 / TCIDL1 three-phase class 1 meter-analyzers (transformer-operated and direct connection). We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

How does TCIL2 differ from TCIL1?

TCIL2 is bidirectional, supports up to 6 tariffs, works with x/5 A and x/1 A and has RS485 with Modbus RTU or BACnet. A version with Ethernet (Modbus TCP) is available.

How many meters can be linked over RS485?

Up to 32 instruments in one line or up to 128 through a converter.

Do these meters have a MID certificate?

No, they are intended for technical metering. Certified models are part of TCIDL-MID, including TCIDL1-MID for 0.25–5(80) A.

Which standards do these meters comply with?

EN 62053-21, EN 62053-22, EN 62053-23 and EN 61010. The meters work with the SACIGEST software (through TTI terminals) and data concentrators.

Similar products

Test and measurement

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.