Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

UPS AND POWER SUPPLIES

SLC TWIN PRO2 / TWIN/3 PRO2 — online UPS 0.7–20 kVA (tower)

A single-phase double conversion online UPS in a tower case, with a range from 0.7 to 20 kVA. The TWIN/3 PRO2 version of 8–20 kVA accepts a three-phase input and gives one phase. It is intended for sensitive and critical loads in server rooms, laboratories and production.

Power
0.7–3 kVA; 4, 5, 6, 8, 10, 15, 20 kVA; TWIN/3 PRO2 — 8–20 kVA with three-phase input (III/I)
Topology
online, double conversion
Output cos φ
0.9 (0.7–3 kVA), 1.0 (4–20 kVA, 1-phase input)
Modes
On-line, Eco, bypass, frequency converter, parallel redundancy

Technical specifications

Power0.7–3 kVA; 4, 5, 6, 8, 10, 15, 20 kVA; TWIN/3 PRO2 — 8–20 kVA with three-phase input (III/I)
Topologyonline, double conversion
Output cos φ0.9 (0.7–3 kVA), 1.0 (4–20 kVA, 1-phase input)
ModesOn-line, Eco, bypass, frequency converter, parallel redundancy
InterfacesUSB HID, SNMP/relay slot

Specifications are taken from the manufacturer’s technical documentation. Updated .

Description

Double conversion separates the load from the mains, so sags, surges and frequency deviations do not reach the output. The smaller models of 0.7–3 kVA have an output cos φ of 0.9, and from 4 kVA with a single-phase input it equals 1.0, that is, the kVA rating matches the active power. The larger sizes of 4, 5, 6, 8, 10, 15 and 20 kVA are suitable for small server rooms and automation panels. Besides the online mode, the UPS works in Eco for saving energy, in bypass during maintenance, as a frequency converter and in a parallel redundancy scheme. The backup time is increased with additional battery units. For communication there are USB HID and a slot for an SNMP card or a relay card.

How to choose

Power is counted in active watts, and up to 3 kVA the cos φ of 0.9 must be taken into account, that is, the output in watts will be lower than the rating. If the site has three phases and the load is single-phase, choose TWIN/3 PRO2 in the range of 8–20 kVA. A need for cloud IoT monitoring and cos φ 1.0 across the whole range leads to the next generation SLC TWIN PRO3 of 4–20 kVA. For simple office tasks without double conversion, the line-interactive SPS ADVANCE is enough.

Request a price and lead time

SLC TWIN PRO2 / TWIN/3 PRO2 — online UPS 0.7–20 kVA (tower). We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

What is the output cos φ of the SLC TWIN PRO2?

0.9 for the models of 0.7–3 kVA and 1.0 for the models of 4–20 kVA with a single-phase input.

How does TWIN/3 PRO2 differ from TWIN PRO2?

TWIN/3 PRO2 has a three-phase input and a single-phase output in the III/I scheme and is made in 8–20 kVA.

Can the backup time of the SLC TWIN PRO2 be increased?

Yes, the series is designed for connecting additional battery units for longer operation from batteries.

Can the SLC TWIN PRO2 work as a frequency converter?

Yes, the modes include a frequency converter, along with On-line, Eco, bypass and parallel redundancy.

How to monitor the SLC TWIN PRO2 over the network?

Install an SNMP card in the expansion slot. For a local connection to a server there is USB HID, and the relay card gives dry contacts.

Similar products

UPS and power supplies

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.