Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

UPS AND POWER SUPPLIES

Sentinel Dual SDU — online UPS tower/rack 4–10 kVA

Sentinel Dual SDU covers 4–10 kVA, with the 5–10 kVA models giving full power at PF = 1 and the 4 kVA entry model delivering 3.6 kW. This double-conversion online UPS stands on the floor or goes into a rack and feeds critical loads and medical equipment.

Power
4 kVA / 3.6 kW; 5–10 kVA/kW (PF = 1)
Input/output
1:1; 3:1 (TM models 8 and 10 kVA); DI versions with separate bypass input
Topology
online, VFI-SS-111
Efficiency
up to 95 % (online), 98 % (ECO)

Technical specifications

Power4 kVA / 3.6 kW; 5–10 kVA/kW (PF = 1)
Input/output1:1; 3:1 (TM models 8 and 10 kVA); DI versions with separate bypass input
Topologyonline, VFI-SS-111
Efficiencyup to 95 % (online), 98 % (ECO)
Overload110 % — continuous, 130 % — 1 h, 150 % — 10 min
Parallel operationup to 3 UPS; SDU Modular MBB kit with maintenance bypass (1-ph 50 A or 3-ph 18 A)
Designtower 131×640×448 mm or 19″ 3U
Noise<48 dBA
Customs codes (for reference)
HS code8504.40
UKTZED code (Ukraine)8504403000
CN code (EU)85044095

Specifications are taken from the manufacturer’s technical documentation. Updated . Customs codes are for reference only; the final code is determined at customs declaration for the specific model.

Description

The topology is VFI-SS-111 online, with up to 95 % efficiency online and 98 % in ECO. The TM models at 8 and 10 kVA accept a three-phase input (3:1), and DI versions have a separate bypass input that can be fed from another feeder. Continuous load may reach 110 %, with 130 % allowed for 1 h and 150 % for 10 min. EnergyShare sockets drop non-essential loads on battery, and USB/RS232 ports and a card slot serve monitoring. Up to 3 UPS run in parallel. For parallel use and service without dropping the load there is the SDU Modular MBB with a manual bypass rated 50 A single-phase or 18 A three-phase. It comes as a 131×640×448 mm tower or a 19″ 3U unit, with noise below 48 dBA.

How to choose

Start with the supply. On a single-phase line any model works, while a three-phase input exists only on the TM units at 8 and 10 kVA. If the load exceeds 3.6 kW, take the 5 kVA model even when its kVA fits within 4. Medical and IT sites with two feeders choose the DI version. On ships, use the Sentinel Dual Marine at 6 and 10 kVA/kW rated for up to 45 °C. For loads under 3,000 VA without double conversion, a line-interactive Vision Dual at 1,100–3,000 VA is enough.

Request a price and lead time

Sentinel Dual SDU — online UPS tower/rack 4–10 kVA. We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

How loud is the Sentinel Dual SDU UPS?

Below 48 dBA, quiet enough for an office near workstations.

How many Sentinel Dual SDU units can be paralleled?

Up to 3 units. The SDU Modular MBB kit for parallel systems is rated 50 A single-phase or 18 A three-phase.

Can the Sentinel Dual SDU go into a 19-inch rack?

Yes, it takes 3U in a rack. The floor-standing version measures 131×640×448 mm.

What kW rating does the 4 kVA Sentinel Dual SDU have?

3.6 kW. The 5–10 kVA models run at PF = 1, so their kVA equals kW.

How does the DI version differ from the standard Sentinel Dual SDU?

The DI version has a separate bypass input that connects to a different power source.

Similar products

UPS and power supplies

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.