
HSTP3T three-phase online UPS 10–40 kVA
Country: · Model: HSTP3T
A three-phase online UPS of 10–40 kVA (9–36 kW) with double conversion and an efficiency in ECO mode over 98 %. It has parallel expansion, a dual input and a maintenance bypass. Used in server rooms, data centers, industrial plants and power stations.
- Power
- 10–40 kVA (9–36 kW)
- Phases
- 3 phases
- Topology
- online, double conversion
- Efficiency in ECO mode
- > 98 %
Technical specifications
| Power | 10–40 kVA (9–36 kW) |
|---|---|
| Phases | 3 phases |
| Topology | online, double conversion |
| Efficiency in ECO mode | > 98 % |
| Other | parallel expansion, dual input, maintenance bypass |
| Case | tower; BCWOB models with a battery compartment without batteries |
Specifications are taken from the manufacturer’s technical documentation. Updated .
Description
Three phases at the input and output are needed where the load is distributed between phases or three-phase equipment is powered. The online double-conversion scheme keeps the load on the inverter all the time. The active power is 9–36 kW at 10–40 kVA, so cables and breakers are selected by kilowatts. Parallel expansion makes it possible to increase power with a second UPS without replacing the first. The dual input gives separate lines for the rectifier and the bypass, and the maintenance bypass makes it possible to service the UPS without switching off the load. The case is a tower, and the BCWOB models have a battery compartment without batteries, where your own batteries are installed. An efficiency in ECO mode of over 98 % reduces heat losses, which is noticeable for data centers and plants with a round-the-clock load.
How to choose
The size is selected by the active power of 9–36 kW, not by kVA. If more backup is needed than one model gives, parallel expansion solves this without replacing the UPS. For batteries there is the BCWOB variant with a compartment without batteries, for a separate battery assembly of the required capacity. For smaller loads on a single phase look at Online High-Density of 5, 6 and 10 kVA.
Request a price and lead time
HSTP3T three-phase online UPS 10–40 kVA. We reply within one business day.
Or email office@usk.ua or call +38 (044) 339-50-20.
FAQ
What is the active power of the 10–40 kVA UPS?
9–36 kW, so cables and breakers are selected by exactly these kilowatts.
What is the efficiency of the UPS in ECO mode?
Over 98 %, which reduces losses and heat release in the server room or data center.
Can power be increased in parallel?
Yes, the UPS supports parallel expansion, and there is also a dual input and a maintenance bypass.
What does the designation BCWOB mean?
These are models with a battery compartment without batteries, into which your own battery assembly is installed.
Similar products
REQUEST
Need a price, lead time or replacement?
Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.



