Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

UPS AND POWER SUPPLIES

HPi 33 EVO — three-phase online UPS, 10–40 kVA

A three-phase online UPS for 10–40 kVA with digital DSP control, which at an output power factor of 1 means the same 10–40 kW. Efficiency is up to 95 %, and up to 4 units can run in parallel. It powers IT, telecom, process and medical equipment.

Power
10–40 kVA / 10–40 kW (cos φ = 1)
Output power factor (cos φ)
1
Efficiency
up to 95 %
Parallel operation
up to 4 UPS units (N+X)

Technical specifications

Power10–40 kVA / 10–40 kW (cos φ = 1)
Output power factor (cos φ)1
Efficiencyup to 95 %
Parallel operationup to 4 UPS units (N+X)
Display5″ touchscreen
Otherconformally coated boards, dust filter
Customs codes (for reference)
HS code8504.40
UKTZED code (Ukraine)8504403000
CN code (EU)85044095

Specifications are taken from the manufacturer’s technical documentation. Updated . Customs codes are for reference only; the final code is determined at customs declaration for the specific model.

Description

The topology is online, the inverter feeds the load continuously, and transfer to battery happens with no gap at the output. Parallel operation of up to 4 units follows an N+X layout, where some units carry the load and the rest stand by. Boards are conformally coated and cooling air passes through a dust filter, so the UPS copes with workshop dust and humid plant rooms. The filter needs regular cleaning, at intervals set by how dusty the room is. A 5″ touch display on the front shows operating modes and events without connecting a laptop. With an output power factor of 1 the kVA rating equals the kW rating, so no power factor conversion is needed.

How to choose

Size the rating by the load in kW within 10–40 kVA, and add redundancy with a second unit in parallel. Coated boards and the filter make this model a good fit for production areas where an office UPS clogs with dust quickly. For loads up to 20 kVA in a tight space, Keor Compact with a 0.22 m² footprint is smaller. Once the load passes 40 kVA, move to Keor MP for 10–200 kVA.

Request a price and lead time

HPi 33 EVO — three-phase online UPS, 10–40 kVA. We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

How many HPi 33 EVO units can run in parallel?

Up to 4 units in an N+X layout.

What is the efficiency of HPi 33 EVO?

Up to 95 % at an output power factor of 1.

What is the HPi 33 EVO rating in kVA and kW?

10–40 kVA, which is the same 10–40 kW because the output power factor is 1.

Can HPi 33 EVO be installed in a dusty room?

Yes, the boards are coated and air passes through a dust filter. The filter needs regular cleaning.

What display does HPi 33 EVO have?

A 5″ touch display on the front panel shows the UPS modes and events.

Similar products

UPS and power supplies

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.