Keor MP — three-phase online UPS, 10–200 kVA
Country: France · Model: Keor MP
A three-phase online UPS for 10–200 kVA, with the system scaling to 1.2 MW. Efficiency is up to 96 % and input power factor is above 0.99. It goes into corporate and edge data centers, hospitals, factories and infrastructure sites.
- Power
- 10–200 kVA; scalable up to 1.2 MW
- Efficiency
- up to 96 %
- Input power factor (cos φ)
- > 0.99
- Parallel operation
- up to 4 UPS units
Technical specifications
| Power | 10–200 kVA; scalable up to 1.2 MW |
|---|---|
| Efficiency | up to 96 % |
| Input power factor (cos φ) | > 0.99 |
| Parallel operation | up to 4 UPS units |
| Batteries | built-in VRLA or lithium-ion |
| Charger | up to 12–18 A |
| Customs codes (for reference) | |
| HS code | 8504.40 |
| UKTZED code (Ukraine) | 8504403000 |
| CN code (EU) | 85044095 |
Specifications are taken from the manufacturer’s technical documentation. Updated . Customs codes are for reference only; the final code is determined at customs declaration for the specific model.
Description
The topology is online, the inverter feeds the load all the time, and there is no transfer at the output when the mains fails. Keor MP runs in parallel with up to 4 UPS units for N+1 redundancy or extra power. Batteries are built into the enclosure, either VRLA or lithium-ion. The charger supplies up to 12–18 A, which sets how fast the battery recovers after a discharge. With an input power factor above 0.99 the UPS draws almost no reactive power, so the upstream diesel generator needs no extra margin for it. Internal batteries save floor space, and a separate battery cabinet is needed only for long autonomy.
How to choose
Choose the rating by the load in kVA, with room to grow, within 10–200 kVA. For redundancy, run two units in parallel, and up to 4 for more power. With large battery banks, check that the charge current of up to 12–18 A gives the recharge time you need. For a 19″ rack with a 25 or 50 kVA load, Keor MOD RI is more compact, and above 200 kVA in one cabinet look at Keor MOD+ with 420 and 600 kW.
Request a price and lead time
Keor MP — three-phase online UPS, 10–200 kVA. We reply within one business day.
Or email office@usk.ua or call +38 (044) 339-50-20.
FAQ
How many Keor MP units can run in parallel?
Up to 4 units, for redundancy or added power.
What batteries go into Keor MP?
Internal VRLA or lithium-ion, with charge current up to 12–18 A.
What is the efficiency of Keor MP?
Up to 96 %, with input power factor above 0.99.
How far can Keor MP scale?
One unit delivers 10–200 kVA, and the maker states system scaling up to 1.2 MW.
Does Keor MP work well on a diesel generator?
Yes, with input power factor above 0.99 the generator sees almost no reactive load from the UPS.
Similar products
REQUEST
Need a price, lead time or replacement?
Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.










