SLC CUBE4 / CUBE4 R — three-phase online UPS 7.5–80 kVA
Country: Spain · Model: SLC CUBE4 / CUBE4 R
Three-phase online UPS of a new platform of 7.5–80 kVA with an output cos φ of 1.0 and an efficiency above 96 % in online mode. The batteries are placed in the same cabinet. The rack version CUBE4 R of 7.5–20 kVA is mounted in a 19-inch server cabinet.
- Power
- 7.5–80 kVA; CUBE4 R (19-inch) — 7.5–20 kVA
- Technology
- three-level, 4-core DSP
- Output cos φ
- 1.0
- Input THDi
- < 3 %
Technical specifications
| Power | 7.5–80 kVA; CUBE4 R (19-inch) — 7.5–20 kVA |
|---|---|
| Technology | three-level, 4-core DSP |
| Output cos φ | 1.0 |
| Input THDi | < 3 % |
| Efficiency | > 96 % online, 99 % Eco (CUBE4 R — > 98 % Eco) |
| Parallel operation | yes (CUBE4 R — up to 4 UPS) |
| Connectivity | Nimbus cloud (option) |
Specifications are taken from the manufacturer’s technical documentation. Updated .
Description
The power section is three-level and is controlled by a 4-core DSP processor, which reduces switching losses. In Eco mode the efficiency reaches 99 %, and in CUBE4 R more than 98 %. The input THDi is below 3 %, so the UPS loads the mains and the generator little with harmonics. The batteries built into the cabinet save space in the electrical room, because a separate battery cabinet is not needed for basic backup time. Several units are connected in parallel to increase power or for redundancy, and for CUBE4 R the limit is 4 UPS. Optionally the system is connected to the Nimbus cloud for remote supervision.
How to choose
First decide where the UPS will stand. For a server cabinet with a load up to 20 kVA take the CUBE4 R, and for an electrical room with a load up to 80 kVA the floor-standing CUBE4. If more power is needed, the manufacturer has the three-phase X-PERT and X-TRA. If the load will grow, plan parallel operation at once, since the CUBE4 R is combined up to 4 units without replacing what is already installed. For a single-phase network there are the tower SLC TWIN PRO2 of 0.7–20 kVA.
Request a price and lead time
SLC CUBE4 / CUBE4 R — three-phase online UPS 7.5–80 kVA. We reply within one business day.
Or email office@usk.ua or call +38 (044) 339-50-20.
FAQ
What is the efficiency of the SLC CUBE4?
More than 96 % in online mode and 99 % in Eco. For CUBE4 R the efficiency in Eco exceeds 98 %.
How many CUBE4 R UPS can be connected in parallel?
Up to 4 CUBE4 R UPS in a parallel system, for redundancy or for increasing power.
Are the batteries built into the SLC CUBE4?
Yes, in the CUBE4 the batteries are in one cabinet with the power section, which saves room space.
What is the input THDi of the SLC CUBE4?
Below 3 %, and the output cos φ is 1.0.
Can the CUBE4 be monitored through the cloud?
Yes, as an option the manufacturer offers connection to the Nimbus cloud platform.
Similar products
REQUEST
Need a price, lead time or replacement?
Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.