Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

EV CHARGING STATIONS

RAPTION 80C–240C, Sonic One 320/400 fast and ultra-fast DC charging stations for electric vehicles

Fast and ultra-fast DC charging stations, from RAPTION 80C of 80 kW to Sonic One of 320 kW expandable to 400 kW. Mode 4, two CCS2 connectors, output 150–920 V DC, powered from a three-phase network. They are intended for parking lots, gas stations, highways and logistics centers.

RAPTION 80C
80 kW (266 A), 2 × CCS2, 40 kW per connector
RAPTION 160C
160 kW (500 A), 2 × CCS2, 80 kW per connector; 15″ screen
RAPTION 240C
240 kW (500 A), 120 kW per connector
Sonic One 320 / 400
320 kW (500 A), expandable to 400 kW; flexible power distribution (e.g. 280 + 40 kW); 32″ screen

Technical specifications

RAPTION 80C80 kW (266 A), 2 × CCS2, 40 kW per connector
RAPTION 160C160 kW (500 A), 2 × CCS2, 80 kW per connector; 15″ screen
RAPTION 240C240 kW (500 A), 120 kW per connector
Sonic One 320 / 400320 kW (500 A), expandable to 400 kW; flexible power distribution (e.g. 280 + 40 kW); 32″ screen
Output150–920 V DC, mode 4
Mainsthree-phase
ConnectivityEthernet, 2 × SIM 4G, Wi-Fi, GPRS/GSM; OCPP
FunctionsDLM dynamic power management, contactless payment, cable management system, accessibility for people with reduced mobility

Specifications are taken from the manufacturer’s technical documentation. Updated .

Description

In the RAPTION line, the 80C, 160C and 240C stations deliver 80 kW (266 A), 160 kW (500 A) and 240 kW (500 A), and with two cars the power is split into 40, 80 and 120 kW per connector. The series also includes RAPTION 50, 90C, 100 and 150. Sonic One delivers 320 kW (500 A) expandable to 400 kW and distributes power between cars, for example 280 kW to one and 40 kW to the other. The screen is a vandal-resistant touch screen, 15″ in RAPTION 160C and 32″ in Sonic One, and the cables are 5.5 m long. Communication goes through Ethernet, two SIM 4G slots, Wi-Fi and GPRS/GSM, with the OCPP protocol. There is a contactless payment terminal, an optional cable management system and DLM dynamic power management. The height of the elements and the connection system take people with reduced mobility into account.

How to choose

The power determines how many cars a station serves per hour. For a parking lot or gas station with short stops RAPTION 80C is enough; for a busier site 160C or 240C is used. If ultra-fast charging is needed, look at Sonic One 320 with a reserve up to 400 kW. For slower charging at home or in a parking garage, AC stations of 7.4–22 kW are better, for example URBAN Gen4, ePark Gen4 or eHome 5.

Request a price and lead time

RAPTION 80C–240C, Sonic One 320/400 fast and ultra-fast DC charging stations for electric vehicles. We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

What is the output voltage of RAPTION and Sonic One stations?

150–920 V DC in mode 4. The stations have two CCS2 connectors each and are powered from a three-phase network.

How many kW does each car get if two are charging?

In RAPTION 80C 40 kW per connector, in 160C 80 kW, in 240C 120 kW. Sonic One splits power flexibly, for example 280 and 40 kW.

What is the cable length and screen size?

Cables are 5.5 m. The screen is 15″ in RAPTION 160C and 32″ in Sonic One, both vandal-resistant touch screens.

How is a station connected to the charging network management platform?

Over the OCPP protocol via Ethernet, Wi-Fi or mobile communication (2 SIM 4G slots, GPRS/GSM).

Similar products

EV charging stations

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.