Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

UPS AND POWER SUPPLIES

PowerUPS 6000 Industrial — industrial UPS 6–200 kVA

Industrial UPS rated 6–200 kVA in single- and three-phase versions with a 0 ms transfer time. It works in harsh conditions in manufacturing, transport, logistics, cement plants and oil and gas, where the load includes motors, valves and control cabinets.

Power
6–200 kVA, single- and three-phase
Voltage
220 V (1-ph), 380/400/415 V (3-ph)
Batteries
VRLA, Ni-Cd, Li-ion
Transfer time
0 ms

Technical specifications

Power6–200 kVA, single- and three-phase
Voltage220 V (1-ph), 380/400/415 V (3-ph)
BatteriesVRLA, Ni-Cd, Li-ion
Transfer time0 ms
Inverter overload105–125% 10 min, 125–150% 1 min
Customs codes (for reference)
HS code8504.40
UKTZED code (Ukraine)8504403000
CN code (EU)85044095

Ukrainian replacement/analogue

Specifications are taken from the manufacturer’s technical documentation. Updated . Customs codes are for reference only; the final code is determined at customs declaration for the specific model.

Description

Single-phase models run at 220 V and three-phase models at 380/400/415 V, so the unit feeds a single control panel or the board of a whole process line. The inverter carries 105–125% overload for 10 min and 125–150% for 1 min, enough for motor starts and the inrush of transformers and drives. The battery is matched to the site, with VRLA, nickel-cadmium Ni-Cd or Li-ion options. Ni-Cd is the usual pick for hot, unheated substations and outdoor shelters, where lead-acid ages fast. On industrial sites the UPS backs up process control, emergency shutdown and safety systems until the process reaches a safe state. With 0 ms transfer, PLCs and relays do not notice the feeder trip.

How to choose

First fix the phase count, a single-phase 220 V unit for one panel or a three-phase 380/400/415 V unit for a switchboard. Then check the rating against the heaviest motor start within the overload window, since steady-state load rarely decides. Battery chemistry follows room temperature and required life, Ni-Cd for unheated rooms, VRLA or Li-ion for conditioned ones. A clean IT room of 100–250 kVA is simpler on a EXM2 monoblock, and above 300 kW the step is EXL S1.

Request a price and lead time

PowerUPS 6000 Industrial — industrial UPS 6–200 kVA. We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

What overload can the PowerUPS 6000 Industrial inverter handle?

105–125% for 10 min and 125–150% for 1 min, which covers motor starts without going to bypass.

What batteries can the PowerUPS 6000 industrial UPS use?

VRLA, Ni-Cd or Li-ion across the 6–200 kVA range.

What is the transfer time of PowerUPS 6000 Industrial?

Transfer time is 0 ms, so PLCs and relays do not drop out when the mains fail.

Is PowerUPS 6000 Industrial available in single-phase?

Yes, single-phase models run at 220 V and three-phase models at 380/400/415 V, within 6–200 kVA.

Why choose Ni-Cd batteries for an industrial UPS?

Nickel-cadmium cells tolerate heat and deep discharge better than lead-acid, so they go into unheated substations. PowerUPS 6000 Industrial accepts Ni-Cd alongside VRLA and Li-ion.

Similar products

UPS and power supplies

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.