Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

UPS AND POWER SUPPLIES

Master MPS — three-phase transformer-based UPS 10–200 kVA

Master MPS belongs to the three-phase double-conversion UPS family with an isolating transformer on the inverter, covering 10–200 kVA in 3:3 and 10–120 kVA in 3:1 configuration. It serves data centers, security systems, medical and industrial installations and telecom nodes.

Power
3:3 — 10–200 kVA; 3:1 — 10–120 kVA
Topology
online, VFI-SS-111, inverter with isolation transformer (galvanic isolation)
Parallel operation
up to 8 UPS, distributed or centralized bypass
Batteries
vented lead-acid, VRLA AGM, GEL, NiCd, Li-ion, supercapacitors, flywheels

Technical specifications

Power3:3 — 10–200 kVA; 3:1 — 10–120 kVA
Topologyonline, VFI-SS-111, inverter with isolation transformer (galvanic isolation)
Parallel operationup to 8 UPS, distributed or centralized bypass
Batteriesvented lead-acid, VRLA AGM, GEL, NiCd, Li-ion, supercapacitors, flywheels
OptionsUGS UPS group synchronizer, PSJ parallel system joiner
Featuresrectifier soft start, Battery Care system, ECS mode
Customs codes (for reference)
HS code8504.40
UKTZED code (Ukraine)8504403000
CN code (EU)85044095

Ukrainian replacement/analogue

Specifications are taken from the manufacturer’s technical documentation. Updated . Customs codes are for reference only; the final code is determined at customs declaration for the specific model.

Description

The topology is VFI-SS-111 online with galvanic isolation on the inverter side. The transformer separates the load from the battery circuit and from any DC component, which medical and industrial sites with sensitive controls appreciate. Soft start of the rectifier avoids an inrush when the supply moves from mains to a generator, so the diesel set does not need a large oversize margin. Up to 8 UPS run in parallel with a distributed or centralized bypass. The UGS option synchronizes UPS groups and PSJ joins parallel systems, which is needed with two independent supply busbars. Batteries can be vented lead-acid, VRLA AGM, GEL, NiCd or Li-ion, and supercapacitors or flywheels also fit. Battery Care manages charging to extend battery life, and ECS mode cuts losses.

How to choose

First decide on the output. The 3:3 configuration gives a three-phase output at 10–200 kVA, while 3:1 serves single-phase loads up to 120 kVA. If the load goes past 200 kVA and isolation is still required, look at the Master HP at 100–600 kVA or the Master HE at 100–800 kVA/kW. For 250–800 kVA with no transformer requirement, the transformerless NextEnergy NXE fits with up to 97 % online efficiency. For an industrial 220 V DC bus there is the Master Industrial at 30, 40, 60 and 80 kVA.

Request a price and lead time

Master MPS — three-phase transformer-based UPS 10–200 kVA. We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

How many Master MPS units can be paralleled?

Up to 8 units, with either a distributed or a centralized bypass.

What power does the single-phase output Master MPS have?

In 3:1 configuration the models cover 10–120 kVA.

Does the Master MPS work well on a generator?

Yes, rectifier soft start and transformer isolation make generator operation easier. The 3:3 models come in 10–200 kVA.

Where is the isolating transformer in the Master MPS?

At the inverter output. The load is galvanically separated from the DC link and the battery.

How are two groups of Master MPS units synchronized?

The UGS option synchronizes the groups, and the PSJ option joins parallel systems.

Similar products

UPS and power supplies

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.