Ukrainian Components WarehouseA USK project
UKRSKINDUSTRIAL COMPONENTS

UPS AND POWER SUPPLIES

KSTAR EPI / Master transformer online UPS, 6–40 kVA, 3:1

Supplied as an official KSTAR partner

Transformer-type online UPS units rated 6–40 kVA with 3:1 phasing, that is, a three-phase input and a single-phase output. The EPI series covers 8–40 kVA, the Master series 6–40 kVA. They serve financial and telecom systems, power engineering, healthcare and industrial processes.

Power
EPI 8–40 kVA, Master 6–40 kVA
Phases
3:1
Power factor
EPI up to 0.97 (input); Master 0.8
Input voltage
Master 304–456 V AC

Technical specifications

PowerEPI 8–40 kVA, Master 6–40 kVA
Phases3:1
Power factorEPI up to 0.97 (input); Master 0.8
Input voltageMaster 304–456 V AC
Topologyonline with isolation transformer

Specifications are taken from the manufacturer’s technical documentation. Updated .

Description

Both series are built on the online topology with an isolation transformer, so the load is fed from the inverter and is galvanically separated from the mains. The Master has an input range of 304–456 V AC, suited to networks with noticeable line voltage deviations. The power factor differs between the series. For the EPI it reaches 0.97 at the input, so the network sees an almost resistive load and the feeders and generator carry less reactive current. For the Master 0.8 is stated, and active power should be calculated from this value rather than from the full kVA. A transformer design is heavier than a transformerless one, but it gives galvanic isolation without extra devices. This kind of UPS goes where a power failure stops the process.

How to choose

First calculate the load's active power, since at 0.8 it is noticeably lower than the full kVA. If you need a 6 kVA UPS, only the Master fits, since the EPI starts at 8 kVA. For a compact rack/tower unit of 6–10 kVA with the same 3:1 phasing there is the UCR. If both input and output must be three-phase, look at the UD, 10–80 kVA.

Request a price and lead time

EPI / Master transformer online UPS, 6–40 kVA, 3:1, KSTAR. We reply within one business day.

* — required fields

Or email office@usk.ua or call +38 (044) 339-50-20.

FAQ

What phasing do the EPI and Master UPS series have?

The phasing is 3:1, that is, a three-phase input and a single-phase output. It fits a three-phase feeder with single-phase consumers.

What power range do the EPI and Master have?

The EPI is made for 8–40 kVA, the Master for 6–40 kVA. Only the Master comes at 6 kVA.

Why does an online UPS need an isolation transformer?

It galvanically separates the mains and the load, so the output is isolated from input disturbances. That is the topology of these units.

What is the input voltage range of the Master?

For the Master it is 304–456 V AC. This is the line voltage of the three-phase input.

What is the power factor of the EPI and Master?

The EPI has an input power factor of up to 0.97, and 0.8 is given for the Master. They set how much active power you can connect.

Similar products

UPS and power supplies

REQUEST

Need a price, lead time or replacement?

Send us a request and we will confirm the configuration, lead time and delivery terms. We reply by email.

How we use your data

UKRSK, Ukrainian Components Warehouse, is a USK project. This form saves your email, request details, optional name and company, and attached files on the UKRSK server to process your enquiry. Files are not published in the catalogue. The form currently does not perform automated technical matching or send commercial quotations. To enquire about or delete your data, submit a request using this form and include your reference number. Do not attach passwords, payment details or unrelated confidential materials. Technical rate-limit records are stored separately; no advertising trackers are used.

To monitor page performance we collect LCP, INP and CLS measurements, language, screen category and a random measurement ID. These are stored on our hosting for up to 35 days; form contents, email, IP address and full URL are not recorded in this log. No cookies are used; Do Not Track and Global Privacy Control disable measurement.